Industrial building

Industrial building

Construction of an industrial building made of prefabricated concrete and office for “Chatarras Melitón”

Zaragoza. Spain

Total built area: 3.300 m2

Construction of facilities for Elian’s British School

Castellón. Spain

Total built area: 2.700 m2

Construction of three detached buildings with offices for the EXPERSA company, in the town of Onda (Castellón, Spain)

Total built: 7.600 m2


Construction of industrial building and storage for Roca Ceramics in Valld’Uixó. Spain

Total built area: 14.000 m2


Construction of two detached buildings and offices for Itaca, in La Pobla de Tornesa (Castellón, Spain).

Currently the facilities are being expanded with the construction of a new warehouse.


Contactar

  • Teléfono
    +34 964 517 628
  • Fax
    +34 964 517 628
  • Dirección
    Carrer Sant Jaume, 12,
    12530 Borriana, Castelló